Building Arches Edmonton AB

Arches are constructed over temporary wood centering in Edmonton. Architectural drawings show the basic height and width of the opening. First is to lay out an arch pattern in Edmonton. The best way to lay out an arch pattern is to place the centering on the ground and position the masonry units around it.

Always Plumbing
780-489-8118
Edmonton, AB

Data Provided by:
Natural Born Painters Ltd
(780) 914-2621
4 Hunt Road
edmonton, OO
 
Coventry Homes
(780) 453-5100
17615 - 111 Avenue NW
Edmonton, OO
 
JP Trucking
(780) 966-7308
1121
edmonton`, AB
 
JP Trucking
(780) 966-7308
1121
edmonton`, AB
 
lombard development inc
(780) 482-1334
11941 126 street
edmonton, AL
 
Nilex Inc.
(780) 463-9535
9304 – 39 Avenue
Edmonton, AB
 
Coventry Homes
(780) 453-5100
17615 - 111 Avenue NW
Edmonton, AB
Services
House Styles, House Plans, Home Builder, Master Builder, New Home Development, New Home Builder

Acro Construction
(780) 863-5882
204 6208 180 Street
Edmonton, AB
 
Black Dog Drilling & Environmental Services Ltd.
(403) 396-6389
Box 9137
Sylvan Lake, AB
Services
Water Well Drilling & Services
Awards
Small Employer Certificate of Recognition
Membership Organizations
AWWDA, BBB, CGWA

Data Provided by:

Building Arches

Provided By:

Source: Masonry Construction
Publication date: August 1, 1990

By Christine Beall

Abstract: Arches are constructed over temporary wood centering. Architectural drawings show the basic height and width of the opening.LAY THE ARCH ON THE GROUND FIRSTThe best way to lay out an arch pattern is to place the centering on the ground and position the masonry units around it.WEDGE-SHAPED BRICK ARE EASIER TO LAYArches are usually built of wedge-shaped brick so that the mortar joints are a uniform thickness. To form the curve with standard brick, the mason must make the joints at the bottom of the arch thinner than at the top. The compressive and bond strengths of the mortar must be high; usually only ASTM C 270 Type S and N are recommended for brick and concrete block arches. With standard brick instead of wedge-shaped units, the bond of the mortar is even more important.SHORE FOR AT LEAST 7 DAYSHold the centering in place with wood posts or concrete masonry units with wedges inserted at the top that can be easily driven out. Keep the centering in place for at least 7 days after completion.

The full text of this article is available as a PDF document. To download the PDF version of the article, click here.

Click here to read full article from Masonry Construction