Building Arches Saint John NB

Arches are constructed over temporary wood centering in Saint John. Architectural drawings show the basic height and width of the opening. First is to lay out an arch pattern in Saint John. The best way to lay out an arch pattern is to place the centering on the ground and position the masonry units around it.

Martell Home Builders
(877) 897-8812
Moncton, NB

Data Provided by:
Miramichi Timber Frames Inc.
(506) 773-8993
74 Thornycroft Street
Miramichi, NB
 
Gogan P J Consultants Ltd
(506) 649-5002
Saint John, NB
 
Maricon Construction Management Ltd
(506) 658-6837
Saint John, NB
 
AJ&Sons Construction Ltd.
(506) 836-7338
1850 Route 420 Hwy
Red Bank, NB
 
Mike Cunningham Excavation LTD.
(506) 977-1122
p.o box 24012
saint john, NB
 
Maricon Construction Management Ltd
(506) 658-6804
39 Hatheway Cres
Saint John, NB
 
Alpha-1 Construction Inc
(506) 696-1170
Saint John, NB
 
Data Provided by:

Building Arches

Provided By:

Source: Masonry Construction
Publication date: August 1, 1990

By Christine Beall

Abstract: Arches are constructed over temporary wood centering. Architectural drawings show the basic height and width of the opening.LAY THE ARCH ON THE GROUND FIRSTThe best way to lay out an arch pattern is to place the centering on the ground and position the masonry units around it.WEDGE-SHAPED BRICK ARE EASIER TO LAYArches are usually built of wedge-shaped brick so that the mortar joints are a uniform thickness. To form the curve with standard brick, the mason must make the joints at the bottom of the arch thinner than at the top. The compressive and bond strengths of the mortar must be high; usually only ASTM C 270 Type S and N are recommended for brick and concrete block arches. With standard brick instead of wedge-shaped units, the bond of the mortar is even more important.SHORE FOR AT LEAST 7 DAYSHold the centering in place with wood posts or concrete masonry units with wedges inserted at the top that can be easily driven out. Keep the centering in place for at least 7 days after completion.

The full text of this article is available as a PDF document. To download the PDF version of the article, click here.

Click here to read full article from Masonry Construction