Laterally Bracing Partition Walls to Joists Abbotsford BC

When possible, laterally brace interior concrete masonry partitions along the top of the wall in Abbotsford. It is usually impractical or uneconomical to brace the wall with columns, piers, or pilasters, especially when the walls are built after the building has been occupied.

Miller Vinyl Sundecks
(604) 768-4685
33710 Marshall Road
Abbotsford, BC
 
James Dobney Inspections - Abbotsford
(604) 942-8272
Abbotsford, BC

Data Provided by:
James Dobney Inspections - Richmond
(604) 942-8272
Richmond, BC

Data Provided by:
Axios Home Inspections
250-754-3645
Nanaimo, BC

Data Provided by:
Subject 2 Home Inspections
250-808-5777
Kelowna, BC

Data Provided by:
Ken Buck & Associates
604-302-0144
Abbotsford, BC

Data Provided by:
Ken Buck & Associates
604-302-0144
Abbotsford, BC

Data Provided by:
North Shore Home Services Ltd.
(604) 988-5294
230 MacKay Road
North Vancouver, BC
 
Fuji Home Inspections Ltd
250-878-3436
Kelowna, BC

Data Provided by:
Spindle Stairs & Railings Ltd
(403) 294-0555
6904 30th street se
Calgary, BC
 
Data Provided by:

Laterally Bracing Partition Walls to Joists

Provided By:

Source: MASONRY CONSTRUCTION MAGAZINE
Publication date: May 1, 2007

By Walter A. Laska

When possible, laterally brace interior concrete masonry partitions along the top of the wall. It is usually impractical or uneconomical to brace the wall with columns, piers, or pilasters, especially when the walls are built after the building has been occupied.

Chapter 5 of the Specifications for Masonry Structures (ACI 530.1/ASCE 6-05/ TMS 602-05) allows interior non-bearing concrete masonry partition walls to be constructed to a height 36 times their thickness without any additional reinforcement. Interior partition walls can span twice the height of exterior masonry walls due to the lack of wind loads.

Steel joists can deflect as much as 2 in. at the center point when live loads are applied. When bracing the concrete masonry partition wall to the bottom of the steel joist, a clearance space must be maintained between the top of the wall and bottom chord of the joist to accommodate this movement.

In cases where joists are spanning perpendicular to the partition wall, a clip angle should be welded to the bottom chord of each joist. The top course of the partition should be constructed of two wythes of masonry. Each wythe should be built tight to the vertical leg of the bracing angle and bonded with a partial collar joint. The vertical leg of the angle performs as a shear key, engaging the slot between the two wythes of masonry and holding the wall in place.