» » ยป

Laterally Bracing Partition Walls to Joists Regina SK

When possible, laterally brace interior concrete masonry partitions along the top of the wall in Regina. It is usually impractical or uneconomical to brace the wall with columns, piers, or pilasters, especially when the walls are built after the building has been occupied.

Ultimate Insulation
(306) 205-7366
355 7th Ave
Regina, SK
Services
Spray Foam Insulation
Membership Organizations
Regina Home Builders

Ultimate Insulation
(306) 205-7366
355 7th Ave
Regina, SK
Services
Spray Foam Insulation
Membership Organizations
Regina Home Builders

IDEAL Insulation Inc.
(306) 716-1628
8-101-110st
Saskatoon, SK
 
M & O Construction Ltd
(306) 757-9433
1766 McAra St
Regina, SK
 
Dmyterko H Construction Co Ltd
(306) 545-9909
3348 Lakeshore Crt
Regina, SK
 
general concrete finishers
(306) 692-2212
box 913
moose jaw, SK
 
PrairieXteme I.E.
(306) 421-9968
838 1st street
estevan, SK
 
Commercial Concrete Finishers Ltd
(306) 543-3609
2814 Corbett Rd
Regina, SK
 
Nischk Construction
(306) 586-0544
7220 1st Ave N
Regina, SK
 
Kraushaar Construction Ltd
(306) 591-2737
Regina, SK
 

Laterally Bracing Partition Walls to Joists

Provided By:

Source: MASONRY CONSTRUCTION MAGAZINE
Publication date: May 1, 2007

By Walter A. Laska

When possible, laterally brace interior concrete masonry partitions along the top of the wall. It is usually impractical or uneconomical to brace the wall with columns, piers, or pilasters, especially when the walls are built after the building has been occupied.

Chapter 5 of the Specifications for Masonry Structures (ACI 530.1/ASCE 6-05/ TMS 602-05) allows interior non-bearing concrete masonry partition walls to be constructed to a height 36 times their thickness without any additional reinforcement. Interior partition walls can span twice the height of exterior masonry walls due to the lack of wind loads.

Steel joists can deflect as much as 2 in. at the center point when live loads are applied. When bracing the concrete masonry partition wall to the bottom of the steel joist, a clearance space must be maintained between the top of the wall and bottom chord of the joist to accommodate this movement.

In cases where joists are spanning perpendicular to the partition wall, a clip angle should be welded to the bottom chord of each joist. The top course of the partition should be constructed of two wythes of masonry. Each wythe should be built tight to the vertical leg of the bracing angle and bonded with a partial collar joint. The vertical leg of the angle performs as a shear key, engaging the slot between the two wythes of masonry and holding the wall in place.