Laterally Bracing Partition Walls to Joists Windsor ON

When possible, laterally brace interior concrete masonry partitions along the top of the wall in Windsor. It is usually impractical or uneconomical to brace the wall with columns, piers, or pilasters, especially when the walls are built after the building has been occupied.

Decks and Fences by Ryan
(519) 946-3042
1361 Ouellette Avenue
Windsor, OO
 
Alan Heron Homes Ltd.
416-642-7651
Willowdale, ON

Data Provided by:
Facility Support Services
(705) 360-8951
457 Railway Street
Timmins, ON
 
Price Construction
(519) 729-7281
6 Oakwood Drive, Cambridge, ON Canada N1R 5S3
Cambridge, ON
 
Menard Bros & Associates Ltd
(613) 932-7686
1100 Marleau Avenue
Cornwall, ON
 
Homepros Basement Waterproofing
(905) 823-4663
1616 Hobbs Crest
Mississauga, ON
 
The Energuy Home Energy Advisor - Pickering
(877) 636-3748
Pickering, ON

Data Provided by:
The Energuy Home Energy Advisor - Brampton
(877) 636-3748
Brampton, ON

Data Provided by:
Smartchoice Home and Mold Inspections
(416) 825-7836
59 vanderbrink dr
brampton, ON
Services
Home Inspections,Mold Testing & Removal
Awards
InterNACHI, IAC2
Membership Organizations
$250-$450

VC DRYWALL & ACOUSTICS
(647) 291-7640
1555 FINCH AVE
PICKERING, ON
 
Data Provided by:

Laterally Bracing Partition Walls to Joists

Provided By:

Source: MASONRY CONSTRUCTION MAGAZINE
Publication date: May 1, 2007

By Walter A. Laska

When possible, laterally brace interior concrete masonry partitions along the top of the wall. It is usually impractical or uneconomical to brace the wall with columns, piers, or pilasters, especially when the walls are built after the building has been occupied.

Chapter 5 of the Specifications for Masonry Structures (ACI 530.1/ASCE 6-05/ TMS 602-05) allows interior non-bearing concrete masonry partition walls to be constructed to a height 36 times their thickness without any additional reinforcement. Interior partition walls can span twice the height of exterior masonry walls due to the lack of wind loads.

Steel joists can deflect as much as 2 in. at the center point when live loads are applied. When bracing the concrete masonry partition wall to the bottom of the steel joist, a clearance space must be maintained between the top of the wall and bottom chord of the joist to accommodate this movement.

In cases where joists are spanning perpendicular to the partition wall, a clip angle should be welded to the bottom chord of each joist. The top course of the partition should be constructed of two wythes of masonry. Each wythe should be built tight to the vertical leg of the bracing angle and bonded with a partial collar joint. The vertical leg of the angle performs as a shear key, engaging the slot between the two wythes of masonry and holding the wall in place.